Changed
smos-scheduler
: Fixed that late-schedulings would be scheduled with the wrong time.smos-scheduler
: Use a unique name instead of hash so that schedules no longer need to be rescheduled when they are changed.smos-scheduler
: Redesigned the way schedules are configured to require a name. This is a breaking change and will require a (very mechanical) change to your configuration.smos-web-server
: Fixed some inconsistencies